Construction permit - Public Housing Complex Construction [APPROVED - BLD2024-02759]

1
Image

SPACER
DEPARTMENT OF PUBLIC WORKS

CONSTRUCTION PERMIT APPLICATION

SPACER
  • APPLICANT INFORMATION
    Applicant Name: Nathan Cinaglia
    Business/Company Name: Arditi's Builders
    Mailing Address: 919 Lion Avenue, Fort Carson, Bone County 855
    Phone Number: 9993
    Registration certificate number: CO-1257

    SPACER
    PROJECT INFORMATION
    SPACER
    Project title: Public Housing Complex Construction
    Project Location: Princeton Street, Las Colinas, Los Santos 424, San Andreas
    Type of Construction:
    • [X] Residential
      [ ] Commercial
      [ ] Public Infrastructure
      [ ] Environmental Works
      [ ] Utility Installation
      [ ] Excavation/Grading
      [ ] Other: Specify
    Scope of work:

    The proposed renovation of the old building will involve both exterior and interior modifications to enhance structural integrity, update outdated systems, and improve overall functionality. The project will include the following key phases:

    1. Site Preparation and Demolition
      • Conduct preliminary assessments of the building’s existing structural condition. [] Clear the site, secure perimeter fencing, and install signage for public safety.
      • Demolish sections of the interior and exterior that require upgrades or replacement, while preserving any structural elements that are still viable.
    2. Excavation for Foundation and Utility Upgrades
      • Excavation around the foundation to expose key areas that require reinforcement and repairs. [] Excavate designated sections to install new utility lines, including updated plumbing, electrical, and drainage systems. [] Implement erosion control and dust suppression measures to minimize environmental impact.
    3. Foundation Repairs and Structural Reinforcement
      • Repair, replace, and/or reinforce the existing foundation to ensure long-term stability, addressing cracks, water damage, or compromised sections.
      • Install additional support beams and footings where necessary, particularly in areas affected by prior damage or decay.
    4. Exterior Upgrades
      • Restore or replace damaged exterior walls, roofing, and insulation, prioritizing sustainable and weather-resistant materials.
      • Update windows, doors, and external finishes to enhance energy efficiency and comply with current building codes.
    5. Interior Renovation and System Modernization
      • Replace outdated electrical, HVAC, and plumbing systems with modern, energy-efficient alternatives. [] Reconfigure interior spaces to accommodate new layouts and improve functionality. [] Install new flooring, drywall, and finishes to revitalize interior spaces, while maintaining any original architectural elements that align with the project’s goals.
    6. Sustainability Enhancements
      • Implement sustainable practices such as energy-efficient lighting, water-saving fixtures, and eco-friendly building materials.
      • Ensure the building meets current energy efficiency standards and incorporates features to reduce overall environmental impact.
    7. Final Inspections and Project Closeout
      • Conduct comprehensive inspections of the completed work to ensure compliance with all relevant building codes and safety regulations. [] Complete a final walkthrough with stakeholders to verify project outcomes and finalize any remaining adjustments. [] Clean and prepare the site for occupancy, remove temporary fencing, and restore adjacent public areas.


    These tasks aim to restore and modernize the building, enhancing its functionality, safety, and environmental sustainability.


    Estimated Start Date: 28/OCT/2024
    Estimated Completion Date: 02/DEC/2024

    SPACER
    ENVIRONMENTAL AND SAFETY CONSIDERATIONS
    SPACER
    Is the project located within an Environmentally Sensitive Area (ESA)?
    • [ ] YES
      [X] NO
    Are hazardous materials involved in the construction process?
    • [ ] YES
      [X] NO
    Will the project involve excavation or grading?
    • [X] YES
      [ ] NO
    Will performed works require street closures and/or cause traffic disruptions?
    • [X] YES
      [ ] NO
    If "Yes," please describe the required measures:

    Description of Required Measures for Street Closures:

    To ensure public safety and minimize traffic disruptions, the following measures will be implemented during street closures:
    • Traffic Control Setup:
      Temporary barriers, cones, and signage will be placed around the construction site to clearly mark closed areas and redirect traffic. Detour signs will guide drivers to alternative routes.
    • Scheduled Closures:
      Street closures will be limited to specific phases, such as material deliveries and utility installations, and will be scheduled during off-peak hours when possible to reduce impact.
    • Public Notifications:
      Notices will be distributed to nearby residents and businesses in advance to inform them of the planned closures, along with expected dates and durations.
    • On-Site Traffic Controllers:
      Certified flaggers and traffic control personnel will be stationed at key points to direct vehicles and pedestrians safely around the construction area during active work periods.
    • Access for Emergency Vehicles:
      All traffic control plans will include provisions to allow emergency vehicles access at all times. Coordination with local emergency services will ensure that they are aware of the traffic management plans.
    These measures will ensure that street closures are handled safely, with minimal inconvenience to the public and compliance with city regulations.


    Safety Measures:

    To ensure the safety of workers, pedestrians, and the public throughout the construction of the public housing complex, the following comprehensive safety measures will be implemented:
    1. Personal Protective Equipment (PPE):
      All workers on-site will be required to wear appropriate PPE, including hard hats, safety vests, gloves, steel-toed boots, and eye protection. PPE will be strictly enforced at all times to minimize injury risks.
    2. Site Security and Access Control:
      The construction site will be enclosed with fencing and restricted access gates to prevent unauthorized entry. Only authorized personnel will be allowed on-site, and all workers and visitors will be required to sign in and out. Security personnel will be stationed at entry points during operational hours to monitor access and ensure compliance.
    3. Clear Signage and Barricades:
      Warning signs, barriers, and hazard indicators will be placed around the construction site to alert pedestrians and drivers of potential dangers. Sidewalks adjacent to the site will be closed and clearly marked, with temporary walkways provided where necessary to ensure pedestrian safety.
    4. Traffic and Pedestrian Control:
      Certified traffic controllers will be stationed at key intersections near the construction site during peak times. They will manage traffic flow and guide pedestrians around the site safely. Detours and alternate routes will be clearly indicated with signage, and barriers will be placed to separate work areas from public pathways.
    5. Daily Safety Inspections:
      The site safety officer will conduct daily inspections to identify potential hazards, review equipment conditions, and ensure that all safety protocols are being followed. Any identified hazards will be addressed immediately, and equipment found to be unsafe will be removed from the site.
    6. Fall Protection Systems:
      For any work conducted at heights, scaffolding, guardrails, safety nets, and harnesses will be utilized to prevent falls. Workers involved in elevated tasks will be trained in fall protection protocols, and all fall protection equipment will be inspected regularly.
    7. Dust and Noise Control:
      Dust control measures, such as water spraying, will be implemented to minimize airborne particulates. Noise levels will be monitored, and noise barriers will be installed to reduce the impact on surrounding neighborhoods, especially during early and late hours.
    8. Emergency Response Plan:
      An emergency response plan will be in place, outlining procedures for incidents such as fires, medical emergencies, or severe weather events. Fire extinguishers, first-aid kits, and emergency contact information will be readily accessible throughout the site. All workers will be trained in emergency response protocols, and regular drills will be conducted.
    9. Environmental Protections:
      To prevent environmental contamination, materials will be properly stored, and spill containment systems will be utilized for hazardous substances. Erosion control measures will be implemented to protect nearby stormwater drains and reduce runoff.
    10. Regular Safety Training:
      All workers will participate in mandatory safety training sessions focused on hazard recognition, equipment handling, and emergency procedures. These sessions will be conducted upon hiring and updated regularly to ensure ongoing awareness of the latest safety protocols.
    These safety measures are designed to create a secure working environment, minimize risk to the surrounding community, and ensure that construction activities adhere to OSHA and city safety standards.


    SPACER
    DECLARATION AND SIGNATURE
    I, the undersigned, declare under penalty of perjury that the information contained in this application and accompanying documentation is accurate to the best of my knowledge. I understand that the issuance of this permit does not relieve me from complying with all local, state, and federal regulations governing the proposed construction project. I further understand that the City of Los Santos may revoke this permit if the project does not comply with the Public Works Construction Code or other applicable laws.

    Applicant signature: N. Cinaglia
    Date: 13/OCT/2024

Re: Construction permit - Public Housing Complex Construction

2
Image
SPACER
  • October 17, 2024

    Nathan Cinaglia / Arditi's Builders (CO-1257)

    CONSTRUCTION PERMIT APPLICATION - RECEIVED

    We have received your construction permit application, along with the documentation provided. We will review the information provided to ensure all requirements are met. You will be notified of our decision as soon as the review process is complete.

    If additional information is required, we will contact you promptly.

    If you have any questions or additional information, do not hesitate to call us on 1-800-GOV or 991, or write us an email to [email protected]

    Respectfully submitted,

    Benjamin Mills, Supervisor
    Code Enforcement Bureau
    City of Los Santos

    SPACER

Re: Construction permit - Public Housing Complex Construction [RECEIVED]

3
Image
SPACER
  • October 18, 2024

    Nathan Cinaglia / Arditi's Builders (CO-1257)

    CONSTRUCTION PERMIT APPLICATION - APPROVED

    After reviewing the information you provided, I am pleased to inform you that your construction permit application (Permit No. BLD2024-02759) is approved.

    A representative from both Public Works and Code Enforcement Bureau will be in touch with you shortly to guide you through the next steps of the process, including any inspections, compliance requirements, and timelines associated with your project.

    Please note that Permit No. BLD2024-02759 should be referenced in all future communications or inquiries regarding this specific permit.

    If you have any questions or additional information, do not hesitate to call us on 1-800-GOV or 991, or write us an email to [email protected]

    Respectfully submitted,

    Benjamin Mills, Supervisor
    Code Enforcement Bureau
    City of Los Santos