Construction permit - Re-branding Stage 25 [ACCEPTED]

1
Image

SPACER
DEPARTMENT OF PUBLIC WORKS

CONSTRUCTION PERMIT APPLICATION

SPACER
  • APPLICANT INFORMATION
    Applicant Name: Kaufman Matthew
    Business/Company Name: Stage-25/Roze Enteprise
    Mailing Address: [email protected]
    Phone Number: 2-0-7-0-8-2-8
    Registration certificate number:
    CROWN PUBLIC WORKS | CO-1726
    Roze Enterprise LLC | PS-38231

    SPACER
    PROJECT INFORMATION
    SPACER
    Project title: Re-branding Stage 25
    Project Location: 32-B Rodeo Boulevard Vinewood, Los Santos 802 San Andreas
    Type of Construction:
    • [ ] Residential
      [ ] Commercial
      [ ] Public Infrastructure
      [X ] Environmental Works
      [X] Utility Installation
      [ ] Excavation/Grading
      [ ] Other: Specify
    Scope of work:

    • Construction Site Preparation
      - Delimitation of construction site areas by barriers, cones, and reflective tape to increase visibility at night.
      - There will be limitations to the work area by properly placed and lighted barriers for the citizen to see from a distance.

      Removal of old facades, replacement with new ones.
      - Removal of old facades and their transportation to an authorized landfill.
      - Cladding and insulating the exterior walls of the business.
      - Adding new facades over the insulation of the walls.

      Interior Renovation and System Modernization
      - Removal of old furniture and transportation to San Fierro Furniture Factory.
      - Removal of the old electrical circuit, sorting out sockets and cables and recycling them.
      - Adding a new, stronger, safer electrical circuit.
      - Installing the flooring, strategically structuring all walls and interior decoration.
      - Addition of sanitary groups and fire prevention systems.
      - Addition of multiple water hose coupling points and smoke alarms.

      Final check, testing of all systems and inspection of all exit points.
      - Conduct inspections of the completed work to ensure compliance with all relevant building codes and safety regulations.
      - Removal of all barriers, ladders, scaffolding from inside the building, and their safe transportation back to the warehouse.

    Estimated Start Date: 18/JAN/2025
    Estimated Completion Date: 30/JAN/2025

    SPACER
    ENVIRONMENTAL AND SAFETY CONSIDERATIONS
    SPACER
    Is the project located within an Environmentally Sensitive Area (ESA)?
    • [ ] YES
      [ X] NO
    Are hazardous materials involved in the construction process?
    • [ ] YES
      [X ] NO
    Will the project involve excavation or grading?
    • [ ] YES
      [X ] NO
    Will performed works require street closures and/or cause traffic disruptions?
    • [X ] YES
      [ ] NO
    If "Yes," please describe the required measures:

    -Prior to the traffic stop, temporary barriers, cones, and signs will be placed with a sense of responsibility and will clearly indicate the temporary blockage.
    - Traffic will be stopped at times when traffic will be at a reduced level.
    - Considering that this is a residential area, residents will be informed by placing multiple flyers at the entrance of the complex, as well as in their mailboxes.
    - During the unloading of the materials, there will also be traffic directors who already have knowledge in directing traffic as efficiently as possible, in order to avoid traffic jams and to make traffic flow as smoothly as possible.
    - Lastly, the traffic warden will ensure that vehicles that are classified as top priority, ambulances, police cars on duty or any vehicle that requires a clear way will be prioritized.

    Safety Measures:
    • - All workers on-site will be required to wear appropriate PPE, including hard hats, safety vests, gloves, steel-toed boots, and eye protection.
      - In case of using saw tools, drill, power drill, rotary drill, saber saw, or any construction site equipment that exceeds 300 revs per minute, workers will receive exemplary training and instruction beforehand.
      - Sidewalks adjacent to the site will be closed and clearly marked, with temporary walkways provided where necessary to ensure pedestrian safety.
      - For any work conducted at heights, scaffolding, guardrails, safety nets, and harnesses will be utilized to prevent falls.
    SPACER
    DECLARATION AND SIGNATURE
    I, the undersigned, declare under penalty of perjury that the information contained in this application and accompanying documentation is accurate to the best of my knowledge. I understand that the issuance of this permit does not relieve me from complying with all local, state, and federal regulations governing the proposed construction project. I further understand that the City of Los Santos may revoke this permit if the project does not comply with the Public Works Construction Code or other applicable laws.

    Applicant signature: Kaufman M.
    Date: 16/JAN/2025

Re: Construction permit - Re-branding Stage 25

2
Image
SPACER
  • January 17th, 2025

    Matthew Kaufman,

    BUSINESS CONSTRUCTION PERMIT — ACCEPTED

    We are pleased to inform you that your construction permit for Stage 25, submitted on January 17th 2025, has been accepted and is now in effect.
    You are free to proceed with your project as outlined in your request format.

    Anastasia G. Hawthorne, Commanding officer.
    Code Enforcement Bureau
    City of Los Santos

    SPACER
Dr. Hosea James Halliday
Los Santos City Manager
City Manager's Office, Los Santos City Government
Image